Mosaic Work In Progress

The work on the construction of the mosaic art on the peripheral walls started. Sandi (the winner of the design competition) leads the construction team of 5 locals. Lara Levine from Mile Mosaics is also involved in guiding and assuring quality. Training Room 1 has been converted into a mosaic studio. The mosaic design will be translated onto 32 panels first, before being placed on the walls.

The panels look amazing and staff check in every day to see the magic in progress.

team300 Sundetail300 PAnel2Birdcomp